Community Development Projects


Borough of Homestead’s Street Reconstruction Project (CD32-7.3)

 

Specifications

 

Short Way/Tammany Way (E 8th to Dickson)

  1. 2” Superpave 25.0 mm Binder Course (670 SY)
  2. 1.5” Superpave 9.5 mm Fine Graded Leveling (670 SY)
  3. Superpave 9.5 mm Fine Graded Leveling (45 Ton)
  4. Base Repair (20 SY)
  5. Raise Manhole Lid (1)
  6. 6” Keyway (45 LF)
  7. Precast Type M Inlet (1)
  8. 12” PVC Pipe (80 LF)

 

W Pine Way (Sarah to Hays)

  1. 1.5” Superpave 25.0 mm Binder Course (1400 SY)
  2. 1.5” Superpave 9.5 mm Fine Graded Leveling (1400 SY)
  3. Mill 3” (Barco Miller) (50 SY)
  4. Raise Manhole Lid (3)
  5. 6” Keyway (60 LF)

 

W Pine Way (Hays to Sylvan)

  1. 1.5” Superpave 25.0 mm Binder Course (1850 SY)
  2. 1.5” Superpave 9.5 mm Fine Graded Leveling (1850 SY)
  3. Raise Manhole Lid (2)
  4. 6” Keyway (60 LF)

 

E Spruce Way (Maple to West)

  1. 1.5” Superpave 25.0 mm Binder Course (1500 SY)
  2. 1.5” Superpave 9.5 mm Fine Graded Leveling (1500 SY)
  3. Superpave 9.5 mm Fine Graded Leveling (22.5 Ton)
  4. Raise Manhole Lid (3)
  5. 6” Keyway (50 LF)

 